Abstract—EIA (Environmental impact assess- ment)and  environmental  acceptance  both  are important  part  of  coal  mine’s  environmental management.The  demands  in  EIA  period  are materials  particular  in  environmental  accep- tance   period.Then   environmental   acceptance can  feed back  important  informations to  EIA.

Currently,there   is   less   interaction   between these   two   areas.This   article   analyzed   the   cur- rent  situation  and  existing  problems  of  Coal Mine’s EIA and Environmental Acceptance,and proposed  the   establishment  of  an  interactive mechanism.

Keywords-Coal  Mine,EIA,Acceptance,Interac-tion Mechanism。

I      Introduction

Coal is our country’s main body energy,and is an important strategic position in economic and social development in China. Since  the  rcform  and  opcning  up,the  coal  industry  has  made grcat  progrcss,for  the  national  cconomy  providing  the  founda- tion for sustaincd and rapid devclopmcnt of cncrgy sccurity.But we  should  clcarly  sce  that  the  devclopment  of coal  production has brought  a  scrics  of  scrious  ccological  problems.Groundwa- ter is dischargod from coal mining in China about 22 billion m3 cvcry year.Due to  land  subsidence  causod  by  coal mining  area has  reached  400,000  ha.Coal  stockpiles  accumulated  nearly  40 million  tons,occupied  land  more  than   10,000  hectares,and   in- creased  still  200  to  300  hectares  per  year.Our  coal  mine  gas drainage  120  billion  m3  in  less  than  20%,the  average  utiliza- tion.At present  land reclamation rate  is  only  12%,only  the  dis- tribution of coal resources and land resources,combined size of the area cultivated land in China accounted for more than 40% of the  total|1].Land  reclamation  is  still  extremely  dificult.


With the cconomic devclopmcnt lcvcl,pcople paid morc and morc  attcntion  on  thc  valuc  of  cnvironmcntal  quality.The  coal industry   fccls   morc   and   morc    scvcrc   cnvironmcntal   strcss. Therefore,the  environmental  better  management  of the  coal  in- dustry  have  important  practical  significance  to  realize  the  har- monious  development  of  economy  and  environment.As  an  im- portant   means   of   environmental    management,environmental impact  assessment  (referred  to  as  “EIA”)and  completion  of the environmental inspection (referred to as “”environmental inspec- tion”)to limit access to high-pollution projects to improve envi- ronmental  management,supervision   and  implementation  of  en- vironmental   protection   measures,etc.has   played   an   important role.Between    environmental    assessment    and    environmental protection  has  a   strong   correlation.Environmental  concern  is the  acceptance  time  EIA  period  for  water,gas,put  forward  ele- ments  such  as  sound,slag  requirements  and  the  environment control   settings   required    environmental   protection   measures Environmental  acceptance  testing  data  during  the  actual  stage of the EIA forecast data for comparison and analysis.Feed back problems  to  the  EIA  examination  and  approval  and  relevant work unit for pointing out the direction of the next step.EIA and environmental  acceptance  and  promote  each  other  and  improve together.This can effectively improve the level of environmental protection  management  of  construction  projects.

Ⅱ  Acceptance  of  coal  and  environmental  status  of  the  EIA A  EIA  Coal  Mine  Status

Mine  environmental  impact  assessment  work  carried  out over  20  years,and  has  prepared  hundreds  of  mines  and  mine  environmental  impact  report.According to the  characteristics  of  coal  exploitation  and  environmental  impact  location  features,  evaluation  of  ecological  impact  assessment  both  pays  enoughattention,through  the  nccessary  work  and  bencficial  explora- tion.In the  1980s  and  early  1990s,mid  of many  evaluation  unit is mine (pit)report on the surface subsidence caused by develop- ment,soil    erosion,desertification,soil     and    groundwater,forest- ry ecological effects of prediction,and ecological environment of mining  comprehensive  regulation,subsidence   area  development and  utilization,water  and  soil  conservation,ete  conducted  fruit- ful  research.Coal  is  conducted  on  the  EIA  although  fruitful work,but  still  exists  many  problems.Mainly   displays  in(1)lack integrity.The  same  area  coal  development  projects,each  project evaluation   more   respectively,the   lack   of   integrity.(2)targeted weaker.Contents    resembles    the    management    measures,and puts   forward   the    basic    similar,mainly    scene    investigation enough,compilation  time  is   short,the  cause  of  evaluation  con- tent  the  pertinence  and  management  measures  are  relatively weak.(3)Depth   shortage.It   highlights   the    surface   of   surface subsidence  prediction  and  now  the  aquifer  with  water  supply meaning in impact prediction.Some of the EIA report didn’t ex- plain  the  mining  division  and  succeed,not  considered  a  set  of coal pillar protection,not consider a set of coal pillar protection, not   consider   cover   thickness    of   superposition,not   carefully study coalfield exploration report relevant content and not pred- icate the  dynamic  space-time  distribution  of  subsidence.(4)Poor maneuverability.Proposed  environmental  pollution  control  and ecological   restoration   measures    are   many,but    few   concrete measures  for  the  real  effective.Especially  the  initial  implemen- tation  measures  put  almost  all,few  decades  of the  implementa- tion of the measures will only need it for the environmental pro- tection  inspection  work  behind  the  inconvenience  has  caused. This point brought many  inconveniences  for  the  environmental protection  inspection  work[2].

B.Coal  mine  environmental  acceptance  status

Coal mine cnvironmcntal acceptance time is latcr than the coal mine EIA.In 2004,coal mine environmental acceptance formally formed.Thc  author  works  in  the  dcpartmcnt  of  cnvironmental protection  assessment  centers,undertaking  the  technical  review of national  commitment  to  ccological  construction  projccts  ap- proved by the Environmental Protection acceptance of the com- pletion  report.The  EIA  centre  had  accepted  and  organized  and completed  project  technical  review  124  counties,including  coal mine  are  20,about   16%of  the   total  in  2009.There  are  more problems  in  technical  review  and  acceptance  now.It  is  mainly manifested  in(1)Pay  less  attention  to  the  environmental  protection     acccptance.“Hcavy     EIA,light      acccptancc”phcnomcnon exists  generally,this  not  only  displayed  in  acceptance  technolo- gy  work,also  manifest  in   acccptance  managcmcnt.(2)Construc- tion  project  illegal  phenomenon   outstanding.Not  batch   engi- ncering  construction  and  first  without   changes,the  EIA  docu- ments  and  approval  requirement  environmental  measures  im- plementation  does  not  reach  the  designated  position,environ- mental  supervision  not  execution,long  try  not  check-up  illegal phenomenon    common     occurence.Environmental    supervision execution for example,apply for acceptance of the project in eco- logical  141  of EIA,with  44  project  in  reply  clear  requirements engineering    environment    supervision,according    to    statistics, only  ten  project  execution  and  executions  carried  out  have  in- sufficient 25%in 2008.(3)Acceptance survey overall level is not high.Some  acceptance  survey  technical  report  very   coarse,dif- ferent units or same unit compiling report different project direc- tor,quality  difference  is  bigger.

Ⅲ  Coal  mine  with  environmental  protection  acceptance  IA interacting  mechanism  research

A.Coal  mine  in  EIA  and  environmental  acceptance  interaction problems

The  current  EIA  coal projects  and  environmental  interaction is  not   strong   acceptance,lack   of  interaction   mechanisms,Ac-  ceptance in the investigation of environmental protection can be  found,most of the project is completed and major changes in the  EIA stage,which is certainly no lack of the normal changes,but  there are a lot of time bccause the measures proposed in the EIA  does  not  meet  the  actual  situation,difficult  to  implement.

The following review of the author at work had appeared in mine  environmental  inspection  reports  illustrate  the  situation  changes.

1)Suan   ci   ditch   mine   is   in   Inner   Zhungeer,Erdos,Mongolia. Mine  production  capacity  is1,200  tons/year.According  to  in- spection  rcport,the  EIA  of  the  project  document  is  approved, Mine  area  from  41.43  square  kilometers  expanded  to  49.8086 square  kilomctcrs.Onc  sct  of 4  tons/hour  boilcr  changod  to  10 tons/hour  boiler[3];Did  not  fulfil  “put  forward  by  the  EIA  for cnginccring  construction  influcnce  within  thc   first  pancl  oncc placed in place all village relocation”and “by the mine water pu- rification proccssing rcquircmcnts  of rccycle”after  all.

2)GuoTun  mine  project   is  located  in  YunCheng   County,heze City  ShanDong  province.Designed  capacity  of the  mine  is  240million tons annual output of raw coal.EIA of the project docu- ment is approved,the location of waste rock flow field has been adjusted.Industrial  site  covers  an  area  increase  of  about  8.47 ha.Special  railway  line  is  not  completed  and  Increases  coal preparation    plant|4|.

3)HuoBaoGan river mine newly-built project is located at hong- dong   county,linfen,Shanxi    Province.The   mine    the   scale    of annual output is 2.1 million tons.EIA of the project document is approved,when the Mine  area ratio  decreased  1.44  square  kilo-  meters  EIA.The  mine  abolished  the  temporary  open  mine  coal yard,to  a  capacity  of  3,000  tons  of  coal  storage  warehouse  |5 Increase the total  capacity  of the boiler  10  tons/hour.The  origi- nal design of mine water supply self-provided power supply pipe is  no  construction.

Though  analyzing  of  these   cases,after  the  completion  of known  coal  mines,the  paper  compared  with  the  widespread changes  in  the  EIA  phase.The  reason,both  the  normal  adjust- ment  caused  design  changes,but  also  the  measures  proposed  in the EIA phase of unrealistic and can not be fully implemented. The  first  mining  of  about  20  years,you  can  gradually  progress with the relocation of mining,requiring a relocation of place un- reasonable  and  difficult  to  implement.

Recent survey by the environmental acceptance can be found in  the  EIA  phase  of  mine  made  unrealistic  demands  are:”No permanent   waste   dump” 、“Mine   water    completely   compre- hensive    utilization” 、“Gas     all     comprehensive     utilization”. Measures seemed very ideal that put in very big misunderstand- ing  in  practice.The  brief  analysis  with  acceptance  survey  data are  as  follows:Analysis  no  permanent  waste  dump:Mining  and coal  cleaning  process  inevitably  produce  gangue.Gangue  pro- duction,emissions and use not only exist between the difference of time  and   space,still  need  different  production   systems  and even   the   coordination   between   different   enterprisesTherefore gangue  landing  is  inevitable;Analysis  minc  water  completecly comprehensive  utilization:Using  the  gangue  industrialized  pro- duction   has    ccrtain    quantity,quality    rcquircmcnts.But   small and  medium-sized   coking  coal  mine   and  simple  pick  up  the power of a coal mine shaft well gangue generally don’t have indc- pendent   construction   gangue   power   plant   or   coal   resources building materials factory;Analysis Mine water completely com- prchensive utilization:Many  large mining mine water  discharge, and  recycling  means  more  than.The  north  of  coal  winter  was unable  to  afforest  irrigation.Completely  comprchensive  utiliza- tion  is  impractical.Furthermore,from  the  perspective  of  watercirculation  system,the  cxcess back to the nature  of minc watcr  purification,can  be  re-involved   in   groundwater,surface  water, evaporation,precipitation  cycle,is  also  on  the  ecological  envi- ronment play a role in recovery;Analysis gas all comprehensive utilization:Gas  utilization  condition,first  is  needed  to  reach  a certain      concentration,secondly,customer      requirements,other- wise  can’t  comprehensive  utilization.

With  no  unimpeded  information  feedback  channel,currently repeating these environmental EIA still survey found acceptance of unrealistic  demands,so  soon  set  a  coal  mine  with  environ- mental  protection  acceptance  interaction  mechanism  of  EIA  is very  necessary.

B.Coal mine is established between the EIA and environmental acceptance  interacting  mechanism   several  Suggestions

Establishing  an  interactive  mechanism  of mine  environmen- tal  assessment  and  environmental  protection  needs  many  de- partments  complement  each  otherSuggestions  establish  mech- anisms for interaction are as follows:

(1)Create  supportive  EIAand  environmental  protection  laws,in- teractive good acceptance policy environment

The  environmental  protection   department  as  our  country’s  highest  the  competent  administrative  department  of  environ- mental  protection  to  establish  environmental  acceptance,the  in- teraction  mechanism  and  the  EIA  attention  and  support  is  the primary  security.The  environmental  protection  department   for- mulates     relevantpolicies,guidelines     and      regulations,system, can   quickly   contributed   to   interactive   mechanism.Provincial, municipal   competent   administrative   departments   of   environ- mental  protection  such  as  drafted  in  accordance  with  their  re- spective jurisdictions characteristics respectively the  system  can ensure   interactive  mechanism   steady   and   rapid   development and  long-term  effective  operation.

(2)Strengthening  science  and  technology   intermediary  ser-  vice  systcm,set  up  cnvironmcntal  asscssmcnt  and  cnvironmcn- tal acceptance of interactive bridge

Environmental  cnginccring  cvaluation  ccnter  is  the  compc-  tent  administrative   department  of  environmental  protection   of the  tcchnical  supporting  dcpartmcnts,has  many  ycars  of  EIA review and environmental acceptance review experience and has a large number of outstanding related professionals.It is the in- teraction  mechanism  relatively  appropriate  technology  interme- diary  services unit It is the interaction mechanism concrete im- plementation unit  and  lcad unit  The  asscssment  center  can bea rich inventory of acceptance of the EIA report and environmentalinformation  to  sort  out,to  establish  a  database,compiled  the data analysis software to detect problems.Each of the EIA report  and  environmental  protection  coal  in  the  compilation  of  accep-  tance report found in unit of work after problems,also can give  feedback     to     the     evaluation     center.Furthermore,evaluation  center  organization  related  experts  and  relevant  units  discuss  how  to  solve  the  problem.After  that  solve  and  improvement  scheme,evaluation  center  by  using  various  network  information  platform  or  technology  journals  conduct  transfer  to  the  EIA  report  and  environmental  acceptance  coal  reports  units.This  set  up  “analysis  of  information  -identify  problems   -discussed   -to  develop  optimal  solutions  -the  standard  requirements  -to  en-  hance the level of”process.The requirements of the EIA more re-  alistic,and   as   times   change   constantly   be   updated   with   the  times,but  also  to  acceptance  of  environmental  protection  more  targeted,more   effective   supervision.

(3)Establish  continuously  improve  the  EIA  and  environmen- tal  public  acceptance  interaction  platform

Environmental   protection   professional   website,professional newspapers  published  articles  can  be  regularly  with  environ- mental  protection,feedback  the  EIA  acceptance  recent  problem, and for all relevant units to strengthen communication and rela- tionship  to  provide  the  platform.And  through  the  propaganda education,and  constantly  improve  the  EIA  report  and  environ- mental  acceptance  coal  report  of  the  responsible  units.Urge  its firmly establish the concept of “seeking truth from facts”

(4)Strengthen  scientific  research  institutions  with  industry association  and  the  interaction  between  and  complement  each other.

Coal related technology association have very rich more in- dustry  information  and  material,advice  and  environmental  pro- tection   department,study   togcther,share   swap   stories.The   sci- entific   research   institutions,including   the   professional   design institute  of coal  industry  related  departments  or  univcrsity,with solid  scientific  research  strength.The  environmental  protection dcpartment or coal minc cnvironmental protcction and compiled EIA unit can entrust their acceptance of study and solve techni- cal problcms.Research results are appliod to rcports for improv- ing report technology level and solving the technical difficulties.

IV  conclusion

This paper mainly introduced the domestic coal mine with en-  vironmental  protection  acceptance  of  the  EIA  status  quo,and  pointed out that both of the interactivity was not  strong,leading to  the  environmental  protection  measures  implementation  EIAproposcd with low levels.This papcr proposcs a coal mine with  environmental   protection    acceptance    interaction   mechanism  EIA the  Suggestions  in  order  to promote  environmental  protec- tion management of coal project.Since the work of environmen- tal protection in China coal mine project long way to go,there are still  many  issues  that  need  further  study.

References

[1    Hu    zhenqi,Li    jing.Zhao    yanling.Problems,Reasons     and Countermeasures  for  Environment  Quality  and  Food  Safety  in the overlapped Areas of Crop and Mineral Protection|J].Technol- ogy Review,2006,(3):21~24

|2]Cheng   jingquan.Coal   development   projects    the   ecological impact  assessment  review   and  reflection[C].Coal   Development and  Construction  Project  Environmental  Protection  Workshop Proceedings,2006

|3|China    Environmental    Science    Research    Institute:Suan    ci ditch mine of the environmental protection report inner Mongo- lia autonomous region  [M].2009

[4]The  environmental  protection  department  environmental   sci- ence engineering evaluation center:GuoTun mine mining area of the  environmental  protection  survey  report  in  juye   Shandong province

[5]Environmental  Protection  Department  of  the  Nanjing   Insti- tute  of  Environmental  Sciences:Huo  baogan  river  mine  mining area  of  the  environmental  protection  survey  report  in  Shan  xi province[M].2009

[6]Environmental  impact  and  control  Resources  Environmental risks|C].Coal  Development  and  Construction  Project  Environ- mental  Protection  Workshop  Proceedings,2006